Boys Bathroom Part15: Floor Tile

still waiting for plumber

September 7-9

Well work is still a bear and I can't take any time off to have the plumber come and fix the pipe in the tub, so I've decided to go ahead and do the floor tile. I've done some internet research and decided to lay down Ditra (the orange stuff). It's thin (1/8 inch) and is suppose to help large format tile not crack. Not too difficult. Precut (comes in large roll), trowel out thinset and lay down. The only issue is that I had two large pieces and adjusting them once they were in the thinset was almost impossible.





After the Ditra layer was dry, I did a little tile planning.